Article 9 of the Saudi Building Code Law

المادة 9 من نظام تطبيق كود البناء السعودي

Amended (1446 AH)

This article bars occupying a building without an occupancy certificate according to the occupancy classification in the Code and under the procedures and periods in the regulations, and makes the certificate an essential condition for the full release of electric current.

Official text after amendments (Arabic)

Compiled from the original text and every officially published amendment; the amendments are shown in full below for comparison.

لا يجوز إشغال البناء إلا بموجب شهادة إشغال بحسب تصنيف الإشغال الوارد في الكود، ووفقاً للإجراءات والمدد التي تحددها اللوائح، وتعد شهادة الإشغال شرطاً أساسياً للإطلاق الكلي للتيار الكهربائي

This is the official Arabic wording, the only legally binding version. We do not translate the law itself; the explanation below is ours. Official source: Bureau of Experts at the Council of Ministers

Article 9 explained in plain English

Practical example

Translated from our Arabic explanation with machine assistance. For guidance only; it does not replace advice from a lawyer on your situation.

How we write and review content

Administrative Law lawyers: ask a specialist about your case

Describe your situation briefly and we'll suggest a lawyer who specialises in this law

Administrative Law (Board of Grievances) lawyers

Lawyers who handle this kind of case

Dr. Ali Al-Rubaie Law Office and Ittihad Al-Asr Legal Company

Riyadh — العليا Consultation from SAR 450
Labour & Employment LawCriminal LawAdministrative LawCivil Litigation & Compensation+4

Al-Safwa Law Office and Legal Consultancy

Jeddah 3.3 (1)
Criminal LawAdministrative LawCommercial & Corporate LawFamily & Personal Status Law+1
See all lawyers

Frequently asked questions about Article 9 of the Saudi Building Code Law

Can I live in a building without an occupancy certificate?

No. The article provides that a building may not be occupied except under an occupancy certificate.

Is an occupancy certificate a condition for connecting electricity?

The occupancy certificate is an essential condition for the full release of electric current.

Who issues the occupancy certificate?

The municipal body (the amanah or municipality) issues it after confirming that the building complies with the Code.

What are the procedures and time for issuing an occupancy certificate?

The Law does not set them. The article refers to the procedures and periods that the regulations set.

Amendment history

  1. Amendment

    Official amendment text (Arabic)

    حذف عبارة "وتعد شهادة الإشغال شرطاً أساساً لإيصال الخدمات" لتصبح بالنص الآتي: "لا يجوز إشغال البناء إلا بموجب شهادة إشغال بحسب تصنيف الإشغال الوارد في الكود، وفقاً للإجراءات والمدد التي تحددها اللوائح".

  2. Royal Decree No. M/88 — 10/4/1446 AH

    Official amendment text (Arabic)

    - عُدلت هذه المادة وذلك بموجب المرسوم الملكي رقم (م/88) وتاريخ 1446/4/10هـ، وذلك بإضافة عبارة "وتعد شهادة الإشغال شرطاً أساسياً للإطلاق الكلي للتيار الكهربائي" إلى عجز المادة لتصبح بالنص الآتي:

    " لا يجوز إشغال البناء إلا بموجب شهادة إشغال بحسب تصنيف الإشغال الوارد في الكود، ووفقاً للإجراءات والمدد التي تحددها اللوائح، وتعد شهادة الإشغال شرطاً أساسياً للإطلاق الكلي للتيار الكهربائي".

Original text before the amendments (Arabic)

لا يجوز إشغال البناء إلَّا بموجب شهادة إشغال بحسب تصنيف الإشغال الوارد في الكود، ووفقاً للإجراءات والمدد التي تحددها اللوائح، وتعد شهادة الإشغال شرطاً أساساً لإيصال الخدمات.