Article 5 of the Saudi Eminent Domain Implementing Regulations
المادة 5 من اللائحة التنفيذية لنظام نزع ملكية العقارات للمنفعة العامة ووضع اليد المؤقت على العقار
The article requires public utility network routes to be coordinated with the Ministry of Municipal and Rural Affairs or the General Authority for Roads, and requires compensation for areas taken outside road routes and for high-voltage tower clearance zones.
Official text after amendments (Arabic)
Compiled from the original text and every officially published amendment; the amendments are shown in full below for comparison.
1 - على الجهات التي تنفِّذ شبكات المرافق العامة التنسيق مع وزارة الشؤون البلدية والقروية أو الهيئة العامة للطرق - كل فيما يخصه - عند تحديد مسار هذه الشبكات؛ لكي تُنَفَّذ - قدر الإمكان - ضمن مسارات الطرق المنفذة أو المحددة على الطبيعة.
2- يجب تنفيذ شبكات المرافق العامة وفقاً للمخطط العام المعتمد الموضح عليه شبكة الطرق الرئيسة التي يتم تنفيذها طبقاً لهذا المخطط، وفي حالة عدم توافره تقوم الجهة صاحبة المشروع باقتراح مسار خطوط المرافق الرئيسة، وتقديمه إلى وزارة الشؤون البلدية والقروية أو الهيئة العامة للطرق - كل فيما يخصه - للموافقة عليه.
3 - إذا اقتضت الحاجة تنفيذ مسار هذه الشبكات ضمن مناطق ليس فيها مسارات طرق أو لا يمكن تحديد مساراتها، فعلى الجهة صاحبة المشروع دفع تعويض مقابل المساحات المقتطعة لأصحاب الأراضي التي تنفذ فيها مسار شبكات المرافق العامة، وذلك وفقاً لأحكام النظام.
4 - بالنسبة إلى مسارات خطوط كهرباء الضغط العالي (الأبراج) التي يتطلب وجودها أحراماً محددة تتجاوز عرض مسار الطريق القائم على الطبيعة أو المقترح على المخططات، على الجهة صاحبة المشروع دفع التعويض المستحق عن المساحات المقتطعة وفقاً لأحكام النظام.
This is the official Arabic wording, the only legally binding version. We do not translate the law itself; the explanation below is ours. Official source: Bureau of Experts at the Council of Ministers
Article 5 explained in plain English
This article regulates the passage of public utility networks such as water and electricity, and the rights of the owners of land they cross:
- Coordination: The implementing bodies must coordinate with the Ministry of Municipal and Rural Affairs or the General Authority for Roads, each as concerns it, when setting the route, so that networks are built as far as possible within the routes of roads that have been built or marked out on the ground.
- The master plan: Networks are built under the approved master plan showing the main road network; if it is not available, the project-owning authority proposes the route of the main lines and submits it to the competent authority for approval.
- Compensation outside road routes: If networks must be built in areas with no road routes or where routes cannot be determined, the project-owning authority pays compensation to landowners for the areas taken under the law.
- High-voltage towers: If they require clearance zones exceeding the width of the existing or proposed road route, the authority pays the compensation due for the areas taken under the law.
Amendment: By Council of Ministers Resolution No. (586) dated 22/8/1444 AH, the phrase "General Authority for Roads" replaced "Ministry of Transport and Logistic Services" in paragraphs 1 and 2.
The article does not set out how compensation is calculated, but refers to the provisions of the law. Anyone whose land is crossed by a utility line or electricity towers can consult a lawyer specializing in real estate matters.
Practical example
A high-voltage electricity line crossed agricultural land owned by Fahd in Qassim, and the towers' clearance zone required an area exceeding the width of the adjacent road. The project-owning authority must pay the compensation due for the area taken under the provisions of the law.
Translated from our Arabic explanation with machine assistance. For guidance only; it does not replace advice from a lawyer on your situation.
How we write and review contentAdministrative Law lawyers: ask a specialist about your case
Describe your situation briefly and we'll suggest a lawyer who specialises in this law
Administrative Law (Board of Grievances) lawyers
Lawyers who handle this kind of case
Dr. Ali Al-Rubaie Law Office and Ittihad Al-Asr Legal Company
Al-Safwa Law Office and Legal Consultancy
Frequently asked questions about Article 5 of the Saudi Eminent Domain Implementing Regulations
Am I entitled to compensation if electricity towers cross my land?
The article requires the project-owning authority to pay compensation for the areas taken for high-voltage tower clearance zones that exceed the width of the existing or proposed road route.
Is the owner compensated if a utility network crosses his land with no road?
Yes. If the network is built in areas with no road routes or where they cannot be determined, the authority pays compensation for the areas taken under the law.
With whom do utility bodies coordinate when setting the route?
With the Ministry of Municipal and Rural Affairs or the General Authority for Roads, each as concerns it.
Amendment history
Amendment — 22/8/1444 AH
Official amendment text (Arabic)
- إحلال عبارة "الهيئة العامة للطرق" محل عبارة "وزارة النقل والخدمات اللوجستية" الواردة في الفقرتين (1) و(2) من هذه المادة وذلك بموجب قرار مجلس الوزراء رقم (586) وتاريخ 1444/8/22هـ.
Original text before the amendments (Arabic)
1 - على الجهات التي تنفِّذ شبكات المرافق العامة التنسيق مع وزارة الشؤون البلدية والقروية أو وزارة النقل - كل فيما يخصه - عند تحديد مسار هذه الشبكات؛ لكي تُنَفَّذ - قدر الإمكان - ضمن مسارات الطرق المنفذة أو المحددة على الطبيعة.
2- يجب تنفيذ شبكات المرافق العامة وفقاً للمخطط العام المعتمد الموضح عليه شبكة الطرق الرئيسة التي يتم تنفيذها طبقاً لهذا المخطط، وفي حالة عدم توافره تقوم الجهة صاحبة المشروع باقتراح مسار خطوط المرافق الرئيسة، وتقديمه إلى وزارة الشؤون البلدية والقروية أو وزارة النقل - كل فيما يخصه - للموافقة عليه.
3 - إذا اقتضت الحاجة تنفيذ مسار هذه الشبكات ضمن مناطق ليس فيها مسارات طرق أو لا يمكن تحديد مساراتها، فعلى الجهة صاحبة المشروع دفع تعويض مقابل المساحات المقتطعة لأصحاب الأراضي التي تنفذ فيها مسار شبكات المرافق العامة، وذلك وفقاً لأحكام النظام.
4 - بالنسبة إلى مسارات خطوط كهرباء الضغط العالي (الأبراج) التي يتطلب وجودها أحراماً محددة تتجاوز عرض مسار الطريق القائم على الطبيعة أو المقترح على المخططات، على الجهة صاحبة المشروع دفع التعويض المستحق عن المساحات المقتطعة وفقاً لأحكام النظام.